Redeemer C of E School – Blackburn

The construction of a new pitch, from Green Field to School Playing Field.

Stone rake rows up stones ready for the picker. Stone picker elevates the material and riddles the good soil from the stones and sods. Good soil falls back to the ground. Debris is placed in collector box then tipped into a trailer.

The laser grader, Grades the pitch to levels ready for drainage.

Laser controlled open trench drainage.

The Blecavator creates a tilth ready for seeding and buries stones in one operation.

Sand Dressed and Seeded