Menu
Contact us:

PHILIP DIXON
Pickering Fold Farm
Bezza Lane
Balderstone
Blackburn
Lancashire
BB2 7LQ
Tel: 01772 877289
Fax: 01772 877479
email us.

Golf Courses

Working with Golf Courses across North West England, we pride ourselves on the quality of work we undertake with minimal disturbance. From installation of primary drainage through to creation of ditches and construction of bridges.

1) Installation of primary and secondary drainage systems

Installation of primary drainage system using a using a Mastenbroek trencher fitted with laser levelling equipment. The trencher is also fitted with an elevator which removes excavation spoil directly into following dumpers to be taken to the designated tip areas. Larger diameter twinwall pipe can be installed using tracked excavators. The dumpers are fitted with low ground pressure tyres to minimise the impact on fine turf sward.

image

Sandslitting and vertidraining

image

The blec groundbreaker and top dresser

2) Creation of streams and ditches

First stages of preparation for ditch creation.

Installation of ditch sides to protect from erosion. Ditch complete sides either turfed or seeded.

3) Construction of tees, pathwork and landscaping

4) Clearing of ditches, ponds and lakes


logo-00logo-01logo-02logo-03logo-04logo-05logo-06