Sportsfields / Sportsturf
We undertake:-
- 1) Installation of part or full primary drainage schemes.
- 2) Secondary Drainage, ie. Slitting / Banding.
- 3) & 4) New Sportsfields, upgrading and refurbishments.
- 5) Maintenance work.
1) Installation of part or full primary drainage schemes.
Laser controlled open trench drainage. Conveyor elevates arisings directly from trench to dumper/trailer avoiding contamination of turf.
Placing of clean aggregates, sands, etc. in trench directly after excavating, without spillage. Essential to avoid trench collapse or contamination.
2) Secondary Drainage, ie. Slitting / Banding.
Slit drainage (sometimes known as sand slitting). Normal spacing 1 metre. Slits are cut approximately 50m wide up to 350mm deep. Backfilled with clean aggregate topped with sand/root-zone. Spoil elevated directly into trailer.
Sand/Gravel banding. Sometimes used as an alternative to slitting. One pass operation which cuts a slit, fills with sand,
gravel or clean hard aggregate. A popular method used to rejuvenate tees and greens.
The Blec Ground Breaker and Sand Master relieve compaction and installs a secondary drainage system of sand bands
to link directly to the underground drainage system. The bands are at 260mm centres and up to 200mm deep. Good method
for rejuvenating slit drains. The Ground Breaker can be used without the Sand Master to relieve compaction.
3 & 4) New Sportsfields, upgrading and refurbishments.
5) Maintenance work.
The Charterhouse Overseeder allows seeding to be done without cultivation on either small or large areas. Slits are cut, the seed dropped in and then the roller closes the slit. Can be done in either one pass or several passes.